Description
(2) Front lower links
and longevity
3 gondolas for spacers and a Union caboose to protect the shoves
Roundhouse 12529 HO Scale GP38-2 HELM Leasing HLCX 3839
Athearn RTR 74028 HO Scale Cupola Caboose Santa Fe ATSF 999476 Peco Track (2) Front lower linksAthearn RTR 74028 HO Scale Cupola Caboose Santa Fe ATSF 999476 Perhaps one of the most recognizable icons of American railroading, the caboose completed the train. Cabooses provided shelter for crew at the end of the train. The cupola, which projected above the roof, provided an elevated location for the conductor and rear brakeman to observe their train. They would be on the lookout for overheating wheel bearings, shifting loads, damaged equipment
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























